{"id":1745,"date":"2023-02-20T21:36:06","date_gmt":"2023-02-20T16:06:06","guid":{"rendered":"https:\/\/evconnectmag.in\/?p=1745"},"modified":"2023-02-20T21:36:07","modified_gmt":"2023-02-20T16:06:07","slug":"flo-to-supply-gms-dealer-community-charging-program-and-help-automaker-expand-public-charging-locations-in-communities-across-north-america","status":"publish","type":"post","link":"https:\/\/evconnectmag.in\/index.php\/2023\/02\/20\/flo-to-supply-gms-dealer-community-charging-program-and-help-automaker-expand-public-charging-locations-in-communities-across-north-america\/","title":{"rendered":"<strong>FLO to Supply GM&#8217;s Dealer Community Charging Program and Help Automaker Expand Public Charging Locations in Communities across North America<\/strong>"},"content":{"rendered":"\n<p>FLO, a leading North American electric vehicle (EV) charging network operator and smart charging solutions provider, has been selected as the supplier for General Motors&#8217; Dealer Community Charging Program. This program will install up to 40,000 public&nbsp;Level 2 EV chargers in local communities across&nbsp;North America. This project is the single largest deployment of EV chargers across&nbsp;North America.<\/p>\n\n\n\n<p>FLO will manufacture&nbsp;CoRe+ MAX\u2122 chargers&nbsp;that will be provided to participating dealers. FLO&#8217;s CoRe+ MAX charger delivers a maximum power output of 19.2 kW, charges up to 2.7x faster than a typical Level 2 charging station and delivers the most power available to a Level 2 charger. These new charging stations will join the FLO network and GM&#8217;s Ultium Charge 360 network and will be available to all EV drivers.<\/p>\n\n\n\n<p>Through the&nbsp;<a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=3730062-1&amp;h=2175378313&amp;u=https%3A%2F%2Fpressroom.gm.com%2Fgmbx%2Fus%2Fen%2Fpressroom%2Fhome%2Fnews.detail.html%2FPages%2Fnews%2Fus%2Fen%2F2021%2Foct%2F1026-ultium-charger.html&amp;a=Dealer+Community+Charging+Program\" target=\"_blank\" rel=\"noreferrer noopener\">Dealer Community Charging Program<\/a>, GM and its dealers are working together to expand public charging access in underserved rural and urban areas. Participating dealers are eligible to receive up to 10 Level 2 charging stations and GM will connect dealers with installation providers as needed. The charging stations will then be installed in key public locations&nbsp;including workplaces, multi-unit dwellings, event venues, colleges and universities. The first chargers were recently installed in&nbsp;Wisconsin&nbsp;and&nbsp;Michigan&nbsp;at a park, library, sports complex and wellness center.<\/p>\n\n\n\n<p>These EV chargers will be built in&nbsp;North America, primarily at FLO&#8217;s&nbsp;<a href=\"https:\/\/c212.net\/c\/link\/?t=0&amp;l=en&amp;o=3730062-1&amp;h=490629252&amp;u=https%3A%2F%2Fwww.flo.com%2Funcategorized%2Fflo-holds-ribbon-cutting-event-at-michigan-facility%2F&amp;a=brand-new+assembly\" target=\"_blank\" rel=\"noreferrer noopener\">brand-new assembly<\/a>&nbsp;facility and testing lab in&nbsp;Auburn Hills&nbsp;with support from FLO&#8217;s&nbsp;Shawinigan, QC&nbsp;facilities. Located just outside of&nbsp;Detroit, the new facility will help FLO bring more than 250,000 EV chargers to American drivers and create 730 direct, indirect and induced jobs by 2028.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>FLO, a leading North American electric vehicle (EV) charging network operator and smart charging&hellip;<\/p>\n","protected":false},"author":1,"featured_media":1760,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"class_list":["post-1745","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-global-news"],"_links":{"self":[{"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/posts\/1745","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/comments?post=1745"}],"version-history":[{"count":1,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/posts\/1745\/revisions"}],"predecessor-version":[{"id":1761,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/posts\/1745\/revisions\/1761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/media\/1760"}],"wp:attachment":[{"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/media?parent=1745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/categories?post=1745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evconnectmag.in\/index.php\/wp-json\/wp\/v2\/tags?post=1745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}